Weight loss tracker for iPhone
Strivora makes losing weight simpler: clear daily targets, fast food logging and a Friday weigh-in that keeps you on track. Choose from five plans, including a GLP-1 Companion plan for people already taking a GLP-1 prescribed by their doctor.
Free to download · Premium $2.99/month or $24.99/year · Apple Watch with Premium
01
Simple daily calorie and nutrition goals based on your body and the pace you choose.
02
Search the USDA food database or scan a barcode. Save meals and favorites for one-tap logging.
03
One weigh-in a week. Strivora reads your trend and gently adjusts your targets so you keep losing.
Made for real life
Lasting weight loss comes from small, steady habits, not perfect days. Strivora fits into the meals you already eat at home, at work and out with friends, so staying on track feels doable.
GLP-1 Companion plan
Already taking a GLP-1 medication prescribed by your doctor? The GLP-1 Companion plan is a diet plan that goes alongside it, helping you build the healthy eating habits that make your progress last.
We don’t provide medication. Strivora does not prescribe, sell or supply GLP-1 or any other medication, and it never gives dosing advice. Your medication is always between you and your doctor.
Five plans
Choose a plan during setup and switch any time. Your history stays, and your targets recalculate automatically.
Featured plan
A diet plan to follow alongside a GLP-1 prescribed by your doctor: smaller balanced meals, protein and water goals, plus a symptom journal with Premium.
Net-carb tracking with a weekly focus. Optional 16:8 intermittent fasting once you’re settled in.
Fasting unlocks after week 4
Whole-food tracking that flags grains, dairy and processed foods so you can see what fits.
A simple daily calorie budget. Eat what you like, within it, and watch the scale move.
For when your goal is to gain: a small calorie surplus with higher protein to build strength.
iPhone · Widgets · Apple Watch
See today’s progress at a glance with a Home Screen widget and sync weigh-ins with Apple Health. With Premium, add water and weigh-in widgets and check your day on Apple Watch. Light or dark mode, it always looks right.
Everything you need
Thousands of foods from the USDA FoodData Central database, with full nutrition.
Point your camera at a package and log it. Five scans a day free, unlimited with Premium.
Friday weigh-ins update your targets based on your real progress, with safe minimums built in.
Today’s progress on your Home Screen, free. Premium adds water and weigh-in widgets and the Apple Watch app, with one-tap water logging on plans that track water.
Read your weight from Apple Health and save weigh-ins back to it, if you choose.
No selling your data, no health data used for ads, and progress photos never leave your phone.
Take a look
Here’s what you’ll see on your iPhone, in light or dark mode.
Pricing
Subscriptions are billed through your Apple ID and can be canceled any time in Settings.
$0
forever
All five plans included
Best value
$24.99
per year · about $2.08 a month
Save 30% · 7-day free trial
$2.99
per month
Cancel any time
FAQ
No. Strivora does not prescribe, sell or supply GLP-1 or any other medication, and it never gives dosing advice. The GLP-1 Companion plan is a diet and habit plan for people who are already taking a GLP-1 prescribed by their own doctor.
Not at all. Strivora is for anyone who wants to lose weight. You can choose Calorie Counting, Keto or Paleo instead. The GLP-1 Companion plan is simply there for people who are also taking a GLP-1.
No. Strivora shares general nutrition and lifestyle guidance. It does not diagnose or treat any condition. Talk to your doctor before starting a new diet or changing your medication.
Pick the one that matches how you like to eat: Calorie Counting for a simple budget, Keto for low carb, Paleo for whole foods, GLP-1 Companion if you’re taking a prescribed GLP-1, or Lean Bulk if your goal is to gain. You can switch any time.
Weigh in once a week, first thing Friday morning. Strivora looks at your trend and adjusts your targets when needed, always staying above safe minimums. You can undo any adjustment.
Yes. We never sell your data or use your health, food or weight data for advertising. Progress photos stay on your iPhone, and you can delete your account and all your data in the app at any time.
Subscriptions are managed by Apple. Open Settings on your iPhone, tap your name, then Subscriptions, and choose Strivora. Cancel at least 24 hours before your renewal date.
Download Strivora free, pick your plan and log your first meal in about two minutes.
Weight loss tracking for iPhone: clear daily targets, easy food logging and weekly weigh-ins, with plans for calorie counting, keto, paleo, lean bulking and a GLP-1 Companion plan.
Not medical advice. Strivora shares general nutrition and lifestyle guidance. It does not diagnose, treat or prevent any condition, and it does not prescribe, sell or provide GLP-1 or any other medication. Talk to your doctor before changing your diet or medication.
© 2026 Gova Creative LLC. All rights reserved. Apple, iPhone, Apple Watch and App Store are trademarks of Apple Inc.